Major causes of cost and time overruns in the public construction sector in Saudi Arabia
| dc.contributor.advisor | John Terry | |
| dc.contributor.author | BASSAM ABDULRAZIQ A BINAHMAD | |
| dc.date | 2014 | |
| dc.date | 2015-03-06 06:05:21.820 | |
| dc.date.accessioned | 2022-05-29T10:06:11Z | |
| dc.date.available | 2022-05-29T10:06:11Z | |
| dc.degree.department | John Terry | |
| dc.identifier.other | 25215 | |
| dc.identifier.uri | https://drepo.sdl.edu.sa/handle/20.500.14154/44344 | |
| dc.publisher | Saudi Digital Library | |
| dc.title | Major causes of cost and time overruns in the public construction sector in Saudi Arabia | |
| dc.type | Thesis | |
| sdl.thesis.level | Master | |
| sdl.thesis.source | SACM - United Kingdom |
